Draft for Soliciting Opinions on Environmental Impact Assessment of Environmental Protection and Safety Improvement and Renovation Projects
Time: 2022-04-19
The enterprise is located in the Coastal Industrial Park of Jiangsu Binhai Economic Development Zone, which is an industrial park approved by law. It has conducted public participation in planning and environmental impact assessment in accordance with the law, and the nature and scale of this project meet the requirements of the planning and environmental impact assessment report and review opinions. Therefore, according to Article 31 of the "Measures for Public Participation in Environmental Impact Assessment" (Order No. 4 of the Ministry of Ecology and Environment), "For construction projects in industrial parks approved by law, if the industrial park has conducted public participation in planning and environmental impact assessment in accordance with the law and the nature and scale of the construction project meet the requirements of the planning and environmental impact assessment report and review opinions organized by the ecological environment department, the construction unit can simplify the public participation in environmental impact assessment of construction projects in the following ways:) The deadline of 10 working days stipulated in Article 10 (2) and Article 11 (1) of these Measures has been reduced to 5 working days. Therefore, the deadline for the public announcement of this draft for soliciting opinions is set at 5 working days. The public information on the draft for soliciting opinions is as follows:
(1) Brief description of construction project situation
Project Name: Environmental Protection and Safety Improvement and Renovation Project
Construction unit: Dynamic Chemical Binhai Co., Ltd
Project nature: Technical renovation
Industry Category: [C2614] Organic Chemical Raw Material Manufacturing
Construction location: within the existing factory area of Dena Chemical Binhai Co., Ltd. in the Coastal Industrial Park of Jiangsu Binhai Economic Development Zone;
(2) Overview of the Potential Environmental Impact of Construction Projects
The sewage generated by this project mainly includes process wastewater, equipment cleaning water, workshop flushing water, waste gas treatment wastewater, etc. The main pollutants are COD SS、 Salt, ammonia nitrogen, TN, TP, etc.
The main atmospheric pollutants during the operation period of this project are sulfuric acid mist, VOCs, etc.
The solid waste of the project mainly includes distillation residue, filtration residue, wastewater treatment sludge, and raw material packaging materials.
The project noise mainly comes from the operation noise of various pumps, centrifuges, fans and other equipment.
(3) Countermeasures and key points for preventing or mitigating adverse environmental impacts
(1) Waste gas: The process waste gas is combined with secondary condensation, primary alkali absorption, and tank area waste gas and sent to the incinerator for incineration treatment in the plant area. The incineration tail gas is discharged through the exhaust gas outlet after being treated by the rapid cooling device, primary alkali absorption, and primary water film dust removal.
(2) Wastewater: The wastewater from the technical renovation project is treated by two sets of biochemical systems, namely "comprehensive regulation tank+hydrolysis acidification tank+UASB+facultative tank+PACT tank+sedimentation tank+coagulation sedimentation tank+intermediate tank" and "UASB reaction tank+SBR reaction tank", and then combined and discharged into the park's sewage treatment plant through the discharge monitoring tank.
(3) Noise: Reduce the use of high noise equipment through equipment selection; Adopting building sound insulation for high noise equipment, setting up soundproof enclosures, shock absorbers, planting greenery and other noise reduction measures can ensure that the factory boundary noise meets the standard;
(4) Solid waste: Distillation residue is incinerated and disposed of by the incinerator in the factory area, while other waste is entrusted to qualified units for disposal. Solid waste is not discharged.
The pollutants are discharged in compliance with standards after treatment, which is feasible and reliable.
(4) Key points of the conclusion of the environmental impact assessment for this project
The environmental protection and safety improvement and renovation project of Dynamic Chemical Binhai Co., Ltd. complies with relevant national and local industrial policies. The site is located in the coastal industrial park of Jiangsu Binhai Economic Development Zone in Jiangsu Province, which is compatible with regional planning and has a reasonable site selection. Under the premise of conscientiously implementing various environmental pollution control measures, it can achieve standard emissions and meet the requirements of total control. The environmental impact is relatively small and will not change the requirements of the proposed environmental functional zone. Although there are certain environmental risks, the risk value is at an acceptable level with the implementation of risk prevention measures and emergency plans. Therefore, from an environmental perspective, it can be argued that the construction of technological renovation projects is environmentally feasible.
(5) The network link to the entire draft of the Environmental Impact Assessment Report for soliciting opinions, as well as the ways and channels to access the paper version of the report
(1) Draft Environmental Impact Assessment Report for Comments: Please refer to the attached link
⑵ Ways and channels to access paper reports: Contact the construction unit through email, phone, and other means to access paper reports.
(6) Public scope and main issues for soliciting opinions
Scope of soliciting public opinions: including the public who may be directly affected by the construction project.
Main issues for soliciting public opinions: From an environmental perspective, what is your attitude towards the project, and please briefly explain the reasons.
(7) The network link of the public opinion form
The public opinion form for environmental impact assessment of construction projects and the network link for soliciting opinions draft (see attachment).
(8) Ways and channels for the public to express their opinions
The public can provide feedback on the completed public opinion form to the construction unit or environmental impact assessment unit within the specified time through letters, faxes, emails, or phone calls, reflecting opinions and suggestions related to the environmental impact of the construction project. When the public submits their opinions, please provide valid contact information for follow-up if necessary.
(6) Name and contact information of the construction unit
Construction unit: Dynamic Chemical Binhai Co., Ltd
Contact address: Coastal Industrial Park, Binhai Economic Development Zone, Jiangsu Province
Contact: Mr. Zhao
Contact phone number: 15051338813
(7) Name of Environmental Impact Assessment Unit
Environmental Impact Assessment Unit: Jiangsu Kaier Ecological Environment Technology Co., Ltd
Contact: Mr. Zhang
Email: zhanghanjie@163.com
Phone: 15105102858
(8) The starting and ending time for public opinions
The public can provide valuable opinions to the construction unit and environmental impact assessment unit within 5 working days from the date of public announcement of this project.
Dynamic Chemical Binhai Co., Ltd
April 19th, 2022